subject
Engineering, 21.03.2021 09:40 jaxondbagley

Use the time and location indices shown below to estimate the cost of a building that contains 32500 m2 of floor area. The building is to be constructed 2 years from now in City A. The cost of a similar type of building that contained 48300 m2 was completed last year in City C for a cost of USD 33,085,000.

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, viicborella
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
image
Engineering, 04.07.2019 18:10, aliopqwas
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
image
Engineering, 04.07.2019 19:20, horsedoggal1234
Consider airflow over a flat plate of length l = 1.5 m under conditions for which transition occurs at le = 0.9 m based on the critical reynolds number, re, e = 5 x 10. evaluating the thermophysical properties of air at 400 k, determine the air velocity. (hint: use the tables to find the properties of air)
Answers: 3
image
Engineering, 06.07.2019 03:10, Bloom247
List and describe the attached tools in boxford cnc milling machine? and how many tools were used in your projects explain them?
Answers: 3
You know the right answer?
Use the time and location indices shown below to estimate the cost of a building that contains 32500...

Questions in other subjects:

Konu
Mathematics, 06.02.2021 01:00
Konu
Mathematics, 06.02.2021 01:00
Konu
Physics, 06.02.2021 01:00