Engineering, 19.03.2021 15:50 gracerhodes5364

A project has 5 floors of concrete columns, 24 inches on each side and 10 feet high. There are 30 columns per floor. Assume the lumber will be used 3 times and calculate the total cost to build, erect and remove the formwork. No foreman is needed since this is a non-union job. If tabular data is used, use average values. Assume the following material and labor rates. Plywood Lumber Column clampsS10/each which can be used repeatedly Form oil Carpenters Helpers - $25/sheet = $0.88/bf - $20/gal for 400 gal/SFCA application -$26.50/hour $15.00/hour

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, aaliyah80
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
image
Engineering, 04.07.2019 18:10, xboxdude06
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
image
Engineering, 04.07.2019 19:10, Mimidj9279
The sum of the normal stresses does not change as the stress state rotates through an angle. a)-trune b)- false
Answers: 2
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
A project has 5 floors of concrete columns, 24 inches on each side and 10 feet high. There are 30 co...