subject
Engineering, 25.02.2021 08:30 dmurdock1973

1. Which of the following kinds of accessories is fixed bat to the side of the drawer and in the carcass of the drawer
unit?
A. Catches
B. Drawer handle
C. Drawer slide D. Mounting bracket
2. What refers to lumbers that are dressed in four
sides?
A. molding
B. S4S
C. rough lumber D. Tongue and groove
3. What kind of chisel has an upper part shaped like a
hollow cone in which the handle is set?
A. Beveled chisel B. Ordinary flat chisel
C. Socket chisel D. Tang firmer chisel
4. What kind of saw is used to cut along the grain of
wood?​

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, anna22684
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
image
Engineering, 04.07.2019 18:20, DroctorWellsfan
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
image
Engineering, 04.07.2019 18:20, kodyclancy
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
image
Engineering, 04.07.2019 18:20, maciemarklin79981
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
1. Which of the following kinds of accessories is fixed bat to the side of the drawer and in the ca...

Questions in other subjects:

Konu
Mathematics, 10.10.2021 14:00
Konu
Biology, 10.10.2021 14:00
Konu
Mathematics, 10.10.2021 14:00
Konu
Mathematics, 10.10.2021 14:00