subject
Engineering, 19.02.2021 03:00 weeman7760

There are three 15 LCY trucks that will be used to transport the excavated soil. It takes 25 min for a truck to drive to the unloading site, unload and drive back to the excavation area. Instead of being idle till the trucks return from each truck cycle, the excavator unloads soil in a spoil bank at the same swing angle (90o). Calculate the volume of soil in the spoil bank at the end of the excavation. Total volume of excavation is 15,000 BCY.

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, 19deleonl
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
image
Engineering, 04.07.2019 18:10, winterblanco
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
image
Engineering, 04.07.2019 18:10, leomessifanboy678
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
image
Engineering, 04.07.2019 18:10, genyjoannerubiera
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
You know the right answer?
There are three 15 LCY trucks that will be used to transport the excavated soil. It takes 25 min for...

Questions in other subjects: