subject
Engineering, 18.02.2021 21:00 jpyperofficialp2z5xs

A storm with a duration of about 24 hours resultsin the following hydrograph at a gaging station on a river. The flow was 52 cubic meters per second (cms) before the rain began. The drainage area above the gaging station is 1,450 square kilometers. Use the observed hydrograph to develop a 24-hour rainfall duration unit hydrograph for this watershed. Time 0 6 12 18 24 30 36 42 48 54 60 66 72 78 84
(Hours)
Flow 52 52 55 56 97 176 349 450 442 370 328 307 280 259 238
(m3/s)
Time 90 66 102 108 114 120 126 132 138 144 155 156 162 168 176
(Hours)
(m3/s) 214 193 173 145 135 124 114 107 97 86 79 66 62 58 52

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, 19deleonl
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
image
Engineering, 04.07.2019 18:10, chadatkin
Which of the following ziegler nichols tuning methods the response of the controller to a step input should exhibit an s-shaped curve? a)-open loop mode b)-closed loop mode c)-both modes (open & closed) d)-none of the modes (open & closed)
Answers: 3
image
Engineering, 04.07.2019 18:10, juansoto227711
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
image
Engineering, 04.07.2019 18:20, maciemarklin79981
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
A storm with a duration of about 24 hours resultsin the following hydrograph at a gaging station on...

Questions in other subjects:

Konu
Mathematics, 19.08.2019 10:30
Konu
Mathematics, 19.08.2019 10:30
Konu
Mathematics, 19.08.2019 10:30