1. What is the productivity rate using cycle time for the following information: I
Type of Work – Hauling
Average Cycle Time – 35 Minutes
Truck Capacity – 25 Tons
Crew - One Driver
Productivity Factor - 0.85
System Efficiency – 55 Minutes
per
Hour

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 23:20, abbz13
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
image
Engineering, 06.07.2019 03:10, zah16
List and describe the parts of boxford cnc milling machine with pictures?
Answers: 2
image
Engineering, 06.07.2019 03:20, Giabear23
Major ingredients of traditional ceramics (a) silica (b) clay (c) feldspar (d) all
Answers: 1
image
Engineering, 06.07.2019 03:30, relic7391
The load on a bolt consists of an axial pull of 10 kn together with a transverse shear force of 5 kn. the bolt material has a yield strength of syt syc 100 mpa. find the diameter of the bolt at factor of safety n-0.5, n 1 and n-2 using maximum shear stress theory
Answers: 3
You know the right answer?
1. What is the productivity rate using cycle time for the following information: I
Type of Wo...

Questions in other subjects:

Konu
Mathematics, 06.10.2019 03:00