One employee was climbing a metal ladder to hand an electric drill to the journeyman installer on a scaffold about five feet above him. When the victim reached the third rung from the bottom of the ladder he received an electric shock that killed him. The investigation
revealed that the extension cord had a missing grounding prong and that a conductor on the green grounding wire was making
intermittent contact with the energizing black wire thereby energizing the entire length of the grounding wire and the drill's frame.
The drill was not double insulated. What could have been done to prevent this accident?
Stathatay
U
d
f orce
to
ed equipment Grounding conductor program to protect employees on construction sites

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, bunnles
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
image
Engineering, 04.07.2019 18:20, sarah7984
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
image
Engineering, 04.07.2019 18:20, sanchez626
Aheavily insulated piston-cylinder device contains 0.02 m3 of steam at 300 kpa and 200 °c. 1.2 mpa. d this process. team is now compressed in a reversible manner to a pressure of etermine the entropy change and the work done on the steam during this process
Answers: 1
image
Engineering, 04.07.2019 19:10, kimmy6973
What is creep? what is stress relaxation?
Answers: 1
You know the right answer?
One employee was climbing a metal ladder to hand an electric drill to the journeyman installer on a...

Questions in other subjects:

Konu
Physics, 07.10.2020 23:01
Konu
French, 07.10.2020 23:01