subject
Engineering, 12.02.2021 16:20 shermaine17

A traffic light controller receives a 4-bit input that changes every 5 seconds. The input sequence is a simple counter that counts from binary 0 to binary 15 and then starts again from binary 0. These signals go to 4 outputs, NSH, NSL, EWH, EWL. The first two outputs NSH and NSL respectively represent the high and low bits that are fed to the lamps that face in the North-south direction. The other two outputs EWH and EWL respectively represent the high and low bits that are fed to the lamps that face in the East-West direction. The following table indicates how setting the high and low bits determines the color of the lamp: High Low Lamp Color
0 0 Green
0 1 Yellow
1 0 Red
1 1 REd
Each light should be green for 30 seconds, yellow for 5 seconds, and then red for 45 seconds. There should be two 5 second intervals when both lights are red. Assume that for the interval where the input is 0000, the North-South light has just turned green, and the East-West light has been red for 5 seconds already. Design the circuitry that feeds from ABCD to the two outputs. You may represent your answer as algebraic equations (make sure to simplify).

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 16:10, Arealbot
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
image
Engineering, 04.07.2019 18:10, keigleyhannah30
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
image
Engineering, 04.07.2019 18:20, alexis9263
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
image
Engineering, 04.07.2019 18:20, samueltaye
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
You know the right answer?
A traffic light controller receives a 4-bit input that changes every 5 seconds. The input sequence i...

Questions in other subjects:

Konu
Mathematics, 23.01.2021 23:20
Konu
English, 23.01.2021 23:20
Konu
Mathematics, 23.01.2021 23:20