Soil having a void ratio of 0.68 as it exists in a bor- row pit is to be excavated and transported to a fill site where it will be compacted to a void ratio of 0.45. The volume of fill required is 2500 m3 . Find the volume of soil that must be excavated from the borrow pit to furnish the required volume of fill.

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, jadeochoa4466
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
image
Engineering, 04.07.2019 18:10, settasav9641
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
image
Engineering, 04.07.2019 18:10, aaliyah80
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
image
Engineering, 04.07.2019 18:10, namira16
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
You know the right answer?
Soil having a void ratio of 0.68 as it exists in a bor- row pit is to be excavated and transported t...

Questions in other subjects: