subject
Engineering, 01.02.2021 21:50 kelsiee24

Suppose that you have two machines. Machine A gives 10 horsepower, and machine B gives 20 horsepower. You will use these machines to lift an object. Suppose that Machine A takes 1 kJ of energy to lift the object, and it does so in 1 minute. Select all of the statements below that are correct (there may be one or more)? (We assume machines are using their full horsepower, and there are no losses). A. The object will take 1/2 kJ of energy for machine B to lift.
B. The object will take 1 kJ of energy for machine B to lift.
C. The object will take 2 kJ of energy for machine B to lift.
D. The object will be lifted in V2 minute by machine B.
E. The object will be lifted in 1 minute by machine B.
F The object will be lifted in 2 minutes by machine B.
G. None of the above statements are true.

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, abdirahmansoloman
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
image
Engineering, 04.07.2019 18:10, selenamr
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed. gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
image
Engineering, 04.07.2019 19:20, lovenahofer
Apreheater involves the use of condensing steam at 100°c on the inside of a bank of tubes to heat air that enters at 1 atm and 25°c. the air moves at 5 m/s in cross flow over the tubes. each tube is 1 m long and has an outside diameter of 10 mm. what is the minimum value of nl needed to achieve an outlet temperature of t 75 c? what is the corresponding pressure drop across the tube bank?
Answers: 3
You know the right answer?
Suppose that you have two machines. Machine A gives 10 horsepower, and machine B gives 20 horsepower...

Questions in other subjects:

Konu
Mathematics, 19.06.2020 17:57