Engineering, 29.01.2021 16:10 joseylynn2728
A feedback system has the following response specifications:
• Percent overshoot Mp <= 16%
• Settling time ts <= 6.9 sec
• Rise time tr <= 1.8 sec
a. Sketch the region of acceptable closed-loop poles in the s-plane for the system, assuming the transfer function can be approximated as simple second order.
b. What is the expected overshoot if the rise time and settling time specifications are met exactly?
Answers: 2
Engineering, 04.07.2019 18:10, jesuslovesusall3
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
A feedback system has the following response specifications:
• Percent overshoot Mp <= 16%