subject
Engineering, 22.01.2021 14:00 Niktorres560Luckynik

Tech A states that when evacuating an air-conditioning system, the vacuum should be maintained for approximately 10-15 minutes
(but as long as 30 minutes) after the system reaches the boiling
point pressure of water. Tech B states that one main purpose of
evacuating an air-conditioning system is to remove any moisture
from the system. Who is correct?

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 16:10, TheOriginalMeyah
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
image
Engineering, 04.07.2019 18:10, yasminothman02
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
image
Engineering, 04.07.2019 18:10, redrosesxx
Water at 55c flows across a flat plate whose surface temperature is held constant at 95c. if the temperature gradient at the plate's surface for a given value of x is 18 c/mm, find a) local heat transfer coefficient. b) heat flux
Answers: 3
image
Engineering, 04.07.2019 18:10, namira16
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
You know the right answer?
Tech A states that when evacuating an air-conditioning system, the vacuum should be maintained for...

Questions in other subjects:

Konu
English, 01.07.2020 15:01