Engineering, 18.01.2021 14:00 dani19cano
A soil sample is taken from a borrow pit in Bellingham, Washington and has a natural void ratio of 1.27. The soil will be used for a highway project wherein a total of 150,000 m^3 of soil is needed in its compacted state. Its compacted void ratio will be 0.49. How much volume must be excavated from the borrow pit to meet the project requirements?
Answers: 3
Engineering, 03.07.2019 14:10, volleyballfun24
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
Engineering, 04.07.2019 18:10, danksans7011
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
Engineering, 04.07.2019 18:10, bckyanne3
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
A soil sample is taken from a borrow pit in Bellingham, Washington and has a natural void ratio of 1...
Mathematics, 05.05.2020 21:13
History, 05.05.2020 21:13
Mathematics, 05.05.2020 21:13
English, 05.05.2020 21:13
Biology, 05.05.2020 21:13
English, 05.05.2020 21:13
Mathematics, 05.05.2020 21:13