Engineering, 13.01.2021 21:10 agarcia24101993
A graph titled position versus time has an horizontal axis time (seconds) and a vertical axis position (meters). A straight line passes from 0 seconds, 0 meters to 5 seconds, 20 meters.
Calculate the slope of the line on the graph using the formula:
m = m = v subscript 2 - v subscript 1 over x subscript 2 minus x subscript 1.
The slope of the line is
⇒ 4 m/s.
Answers: 1
Engineering, 04.07.2019 18:20, esmemaluma00
Find the minimum film thickness for a journal bearing with the data below. shaft diameter, d-50 mm, clearance ratio, cdratio? 0.001, shaft speed, n 2000 rpm; bearing length. i 200 mm; eccentricity ration, ? -0.55. ( note, cdratio-ca/d) the minimum film thickness is um
Answers: 2
Engineering, 04.07.2019 19:10, phantomlizz3233
In general, how do thermosetting plastics compare to thermoplastics in mechanical and physical properties?
Answers: 3
Engineering, 04.07.2019 19:20, amandaaarmentaa
Acircular pipe of 30mm outside diameter is placed in an airstream at 30 c and latm pressure. the air moves in cross flow over the pipe at 20 m/s, while the outer surface of the pipe is maintained at 110 c. what is the drag force exerted on the pipe per unit length? what is the rate of heat transfer from the pipe per unit length?
Answers: 1
Engineering, 04.07.2019 19:20, nikkiebartels
Afan that can provide air speeds up to 60 m/s is to be used in a low-speed wind tunnel with atmospheric air at 35 c. if one wishes to use the wind tunnel to study flat-plate boundary layer behavior up to reynolds numbes of re 10, what is the minimum plate length that should be used? at what distance from the leading edge would transition occur if the critical reynolds nurnber were rer, e = 5 × 105?
Answers: 2
A graph titled position versus time has an horizontal axis time (seconds) and a vertical axis positi...
History, 24.05.2020 01:58
Mathematics, 24.05.2020 01:58
Mathematics, 24.05.2020 01:58