Calculate the total quantity of bricks, with 2% waste factor, required to be placed in a foundation wall, whose Perimeter of the Wall is 207 ft 4 in.; Height of Wall is 9 ft.; and 8" Wall Thickness, using Common Bond. There are 9 Windows that are 4 ft. by 4 ft. and 1 door that is 4 ft. by 6.5 ft high. Given: Brick size is 8" x 2-1/4" x 3-3/4"
Size of Mortar Joint is 1/2"

what's the anwser?

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, kodyclancy
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
image
Engineering, 04.07.2019 18:20, maustin5323
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
image
Engineering, 05.07.2019 04:30, kookycookiefanx
Technician a says that in a worm gear steering system, most excessive steering free play is usually found in the gearbox. technician b says that in a rack-and-pinion steering system, excessive free play can be found in the bushings. who is correct?
Answers: 2
You know the right answer?
Calculate the total quantity of bricks, with 2% waste factor, required to be placed in a foundation...

Questions in other subjects: