Engineering, 20.11.2020 18:20 AJSkullcrusher
Help plz ASAP 25 points
The Eads Bridge, which crosses the Mississippi River near St. Louis, Missouri, was one of the
first all-steel bridges bullt in the world. The bridge was built by the Keystone Bridge
Company, and, during development, engineers decided that all-steel would be the best
construction, even though it was more expensive, because it would have the greatest
strength, which was needed due to the bridge's size. This description of engineering can be classified as
A. Both a case study and a case history B. A case study. C. Neither a case study nor a case history. D. A case history
Answers: 1
Engineering, 04.07.2019 18:10, Strick1530
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
Engineering, 04.07.2019 19:10, rhiannpelham60
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
Engineering, 04.07.2019 19:20, carterdaw
Aseries piping system conveys methyl alcohol. the system consists of 70 m of 1- nominal pipe follow by 50 m of 2-nominal pipe, both schedule 40 commercial steel. the 1-nominal pipe contains 3 90° elbows (regular) anda fully open gate valve, all threaded. the pressure drop through the system is 150 kpa. determine the volume flow rate through the system that is horizontally laid.
Answers: 1
Help plz ASAP 25 points
The Eads Bridge, which crosses the Mississippi River near St. Louis, Missou...
History, 26.12.2019 01:31
Biology, 26.12.2019 01:31
Mathematics, 26.12.2019 01:31