subject
Engineering, 11.11.2020 23:40 ayoismeisjjjjuan

Why might an insulation worker be necessary in the demolition phase of a reconstruction project? They can eliminate the need for new insulation
They can verify that the old insulation was inadequate.
They can serve as general laborers for the project.
They can remove possibly toxic materials safely

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, 19deleonl
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
image
Engineering, 04.07.2019 18:10, meganwintergirl
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
image
Engineering, 04.07.2019 18:10, michellerosas
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
image
Engineering, 04.07.2019 18:10, ijohnh14
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
You know the right answer?
Why might an insulation worker be necessary in the demolition phase of a reconstruction project? Th...

Questions in other subjects:

Konu
Mathematics, 18.03.2020 07:36
Konu
Mathematics, 18.03.2020 07:37
Konu
Mathematics, 18.03.2020 07:38
Konu
Mathematics, 18.03.2020 07:41
Konu
Physics, 18.03.2020 07:42