subject
Engineering, 31.10.2020 05:10 natu2072

An engineering firm is developing a bridge for trains using recycled materials. It is building prototypes of the bridge to be tested. Which statement best explains why prototyping can be important? A. Building a prototype allows conductors to use the proposed bridge while it is still being tested.

B. Building a prototype allows all brainstormed bridge designs to be modeled.

C. Building a prototype allows the most promising bridge design to be tested in a safe manner.

D. Building a prototype allows the constraints for the bridge to be ignored.

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, demarcuswiseman
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
image
Engineering, 04.07.2019 18:10, 0436500
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
image
Engineering, 04.07.2019 19:20, sashajayne8260
Determine the stoichiometric and actual air-fuel ratios and the mole flue gas composition for combustion with 15% excess air for raw indiana, pennsylvania raw coal.
Answers: 3
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
An engineering firm is developing a bridge for trains using recycled materials. It is building proto...

Questions in other subjects:

Konu
Mathematics, 23.02.2021 20:50
Konu
Mathematics, 23.02.2021 20:50
Konu
Business, 23.02.2021 20:50
Konu
Mathematics, 23.02.2021 20:50
Konu
Biology, 23.02.2021 20:50
Konu
Mathematics, 23.02.2021 20:50