subject
Engineering, 28.10.2020 17:00 arielcainess

A pre-engineering baseline was run down a very steep hill. Rather than measure horizontally downhill with the steel tape, the surveyor measures the vertical angle with a theodolite and the slope distance with a 200-ft steel tape. The vertical angle is -21° 26’ turned to a point on a plumbed range pole that is 4.88 ft above the ground. The slope distance from the theodolite to the point on the range pole is 148.61 ft. The theodolite’s optical center is 4.66 ft above the upper baseline station at 110 + 71.25. (a) If the elevation of the upper station is 318.71, what is the elevation of the lowerstation?

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, ashleybaber4966
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
image
Engineering, 04.07.2019 18:10, soreese02
An ideal otto cycle with air as the working fluid has a compression ratio of 8. the minimum and maximum temperatures in the cycle are 300 k and 1340 k. use constant specific heats at room temperature to determine (a) the amount of heat transferred to the air during the heat- addition kj/kg, (b) the thermal efficiency, and (c) the thermal efficiency of a carnot cycle ope limits. process, in rating between the same temperature
Answers: 2
image
Engineering, 04.07.2019 18:20, dlr1628
Acertain flow of air (at stp) has a velocity distribution given by v i (in ft/s). if this flow is going through a 4 ft square area in the yz-plane (centered at the origin), what is the mass flow rate (in lbm/s)?
Answers: 2
image
Engineering, 04.07.2019 18:20, sanchez626
Aheavily insulated piston-cylinder device contains 0.02 m3 of steam at 300 kpa and 200 °c. 1.2 mpa. d this process. team is now compressed in a reversible manner to a pressure of etermine the entropy change and the work done on the steam during this process
Answers: 1
You know the right answer?
A pre-engineering baseline was run down a very steep hill. Rather than measure horizontally downhill...

Questions in other subjects:

Konu
Mathematics, 09.12.2019 01:31