subject
Engineering, 21.10.2020 16:01 IsoSaysHi

A backsight reading of 2.56 was obtained with rod at A and a foresight reading of 7.45 was obtained with the rod at the trial point B. If B is located 37.00 feet from the center line of a planned 50-foot wide road, is the catch point located uphill or downhill from B? What would the side slope of the cut be if the catch point is located at B? Given: Elevation of A is 251.20 feet. Road bed is to be at the 240.0 foot elevation with 2:1 side slopes.

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, bryneosburn
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
image
Engineering, 04.07.2019 18:10, hadellolo8839
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
image
Engineering, 04.07.2019 18:10, oshawn108
Ahot wire operates at a temperature of 200°c while the air temperature is 20°c. the hot wire element is a tungsten wire of 5 um diameter and 2 mm in length. plot using excel current, heat transfer and heat generated by the wire for air velocity varying from 1-10 m/s in steps of lm/s? matlab the sensor voltage output, resistance, or assume nu 0.989 re033pr13 take air properties at tr (200°c20°c)/2 = 110°c properties of tungsten: c 0.13 kj/kg. k 3 p 19250 kg/m k (thermal conductivity) = 174 w/m. k
Answers: 2
image
Engineering, 04.07.2019 18:20, 1230bering
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
You know the right answer?
A backsight reading of 2.56 was obtained with rod at A and a foresight reading of 7.45 was obtained...