To maximize production and minimize pumping costs, crude oil is heated to reduce its viscosity during transportation from a production field. Consider a pipe-in-pipe configuration consisting of concentric steel tubes with an intervening insulating material. The inner tube is used to transport warm crude oil through cold ocean water. The inner steel pipe (thermal conductivity = 35 W/m-K) has an inside diameter of 150 mm and wall thickness of 10 mm, while the outer steel pipe has an inside diameter of 250 mm and a wall thickness of 10 mm. The ocean water is at T[infinity],0 = -5°C and provides an external convective heat transfer coefficient of 500 W/m^2-K. The convective coefficient associated with the flowing crude oil is 450 W/m^2-K. It is required that the polyurethane foam insulation (thermal conductivity = 0.075 W/m-K) between the two pipes does not exceed its maximum service temperature of 70°C Required:
a. Draw a thermal circuit for this cylindrical pipe-in-pipe configuration.
b. Determine the maximum allowable crude oil temperature such that the polyurethane foam insulation does not exceed its maximum service temperature.
c. For these conditions, also determine the heat transfer per unit length of the pipe.

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, tobyhollingsworth178
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
image
Engineering, 04.07.2019 19:10, phantomlizz3233
In general, how do thermosetting plastics compare to thermoplastics in mechanical and physical properties?
Answers: 3
image
Engineering, 04.07.2019 19:10, nbug2121
Arigid tank contains 10 kg of air at 137 kpa (abs) and 21°c. more air is added to the tank until the pressure and temperature rise to 242 kpa (abs) and 32°c, respectively. determine the amount of air added to the tank. [r-0.287 kj/kg k]
Answers: 3
image
Engineering, 04.07.2019 19:20, lordcaos066
Determine the time of the day and month of the year at which the peak sensible cooling load occurs for a top floor, north-eastern corner room of an office building in durban for the following conditions: floor area: 8 x 8 x 3 m east and north walls: 115 mm face brick (outside), 20 mm air space, 115 mm ordinary brick (inside) with 15 mm plaster roof construction: suspended plasterboard ceiling, 450 mm air space, 150 mm concrete, 75mm screed, waterproofing no heat transfer across other surfaces window area 3x 1,5 m high in north wall only. ordinary glass with venetian blinds. lights and occupants : from 07: 00 to 18: 00 average light density: 25 w/m2 number of occupants : 5 seated, light office work room temperature 24°c
Answers: 3
You know the right answer?
To maximize production and minimize pumping costs, crude oil is heated to reduce its viscosity durin...

Questions in other subjects:

Konu
Biology, 09.02.2021 21:10
Konu
Advanced Placement (AP), 09.02.2021 21:10