subject
Engineering, 04.09.2020 19:01 19thomasar

Please help. Tetra Pak Ltd. is one of the leading business organization in packaging industry of Pakistan, and is currently assessing the commercial risk of its new project. The project which it currently want to peruse is introduction of new packaging material and system that is more of ecological and environmental friendly. This project would require Tetra Pak ltd. to establish new industrial plant in extension of the existing one, so to produce that new packaging material that could be sold to different industries for their packaging (such as beverages industry). Requirement: Assuming that you are part of project risk management team, how would you assess all of the key operating risk and revenue risk of the project (under commercial risk assessment and management)? As well as how would you assess which of the revenue risk management techniques would be appropriate for this project among offtake contracts, concession agreement, and hedging contract (provide rational for your choice for any one or mix approach for protecting organizational revenue).

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, margaret1758
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
image
Engineering, 04.07.2019 18:10, ashleybaber4966
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
image
Engineering, 04.07.2019 18:10, mirmir62
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
image
Engineering, 04.07.2019 18:10, mamasbug4285
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
You know the right answer?
Please help. Tetra Pak Ltd. is one of the leading business organization in packaging industry of Pak...