Consider an economic order quantity case where monthly demand is 125 units, working days in a month are 25 days, economic order quantity is 210 units, the desired service level is 0.95, the standard deviation of demand during lead time is 20 units, and lead time is 13 days. Determine the reorder point.

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, cowgyrlup124
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
image
Engineering, 04.07.2019 18:10, tjeffers90028
Refrigerant 134a enters an insulated compressor operating at steady state as saturated vapor at -26°c with a volumetric flow rate of 0.18 m3/s. refrigerant exits at 9 bar, 70°c. changes in kinetic and potential energy from inlet to exit can be ignored. determine the volumetric flow rate at the exit, in m3/s, and the compressor power, in kw.
Answers: 1
image
Engineering, 04.07.2019 18:10, ayoismeisjjjjuan
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
image
Engineering, 04.07.2019 18:10, chadatkin
Which of the following ziegler nichols tuning methods the response of the controller to a step input should exhibit an s-shaped curve? a)-open loop mode b)-closed loop mode c)-both modes (open & closed) d)-none of the modes (open & closed)
Answers: 3
You know the right answer?
Consider an economic order quantity case where monthly demand is 125 units, working days in a month...

Questions in other subjects:

Konu
Mathematics, 12.08.2020 04:01