subject
Engineering, 16.08.2020 01:01 trinitymarielouis

Can I get a hand? Thanks y’all much luv


Can I get a hand? Thanks y’all much luv

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, abdirahmansoloman
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
image
Engineering, 04.07.2019 18:20, DroctorWellsfan
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
image
Engineering, 06.07.2019 03:20, s6ties
1kg of water contained in a piston-cylinder assembly undergoes two processes in series from an initial state where the pressure is 3.0 bar and the temperature is 150°c process 1-2: the water is compressed isothermally to a volume of 0.25 m^3 with 120 kj of work being done to the system. process 2-3: the water is heated at constant volume to a final pressure of 10 bar. a. find the change in internal energy for the system. b. calculate the amount of heat transferred, in kj. c. sketch both processes on a t-v diagram. (196.33 kj/kg, 76.33 kj)
Answers: 1
You know the right answer?
Can I get a hand? Thanks y’all much luv
...

Questions in other subjects:

Konu
Mathematics, 17.10.2020 07:01
Konu
English, 17.10.2020 07:01
Konu
Mathematics, 17.10.2020 07:01