Engineering, 12.08.2020 08:01 elissiashontelbrown

A commercial refrigerator with refrigerant-134a as the working fluid is used to keep the refrigerated space at 2308C by rejecting its waste heat to cooling water that enters the condenser at 188C at a rate of 0.25 kg/s and leaves at 268C. The refrigerant enters the condenser at 1.2 MPa and 658C and leaves at 428C. The inlet state of the compressor is 60 kPa and 2348C and the compressor is estimated to gain a net heat of 450 W from the surroundings. Determine (a) the quality of the refrigerant at the evaporator inlet, (b) the refrigeration load, (c) the COP of the refrigerator, and (d) the theoretical maximum refrigeration load for the same power input to the compressor.

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 19:10, Destinationz
Asteam is contained in a rigid tank with a volume of 1 m3. initially, the pressure and temperature are 7 bar and 500 oc, respectively. the temperature drops due to cooling process. determine: (1) the temperature at which condensation begins in °c, (2) the fraction of the total mass that has condensed when the pressure decreased to 0.5 bar. (3) the volume in m3 occupied by saturated liquid at the final state?
Answers: 3
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
image
Engineering, 04.07.2019 19:20, Katmcfee7681
Acommercial grade cubical freezer, 4 m on a side, has a composite wall consisting of an exterior sheet of 5.0-mm thick plain carbon steel (kst= 60.5 w/m k), an intermediate layer of 100-mm thick polyurethane insulation (kins 0.02 w/m k), and an inner sheet of 5.0- mm thick aluminium alloy (kal polyurethane insulation and both metallic sheets are each characterized by a thermal contact resistance of r 2.5 x 104 m2 k/w. (a) what is the steady-state cooling load that must be maintained by the refrigerator under conditions for which the outer and inner surface temperatures are 25°c and -5°c, respectively? (b) for power saving purpose, which wall material should be increased/reduced in. thickness in order to reduce 50% of the cooling load found in part (a)? redesign the thickness of the proposed material. 177 w/m-k). adhesive interfaces between the q=575.93 w
Answers: 2
image
Engineering, 06.07.2019 05:30, abbymoses3
Around steel bar, 20 mm in diameter and 400 mm long, is placed concentrically within a brass long. tube which has an outside diameter of 30 mm and thickness 4 mm. the tube is 400 mm the upper end of the vertically placed compound bar is rigidly fixed and a collar is fitted to the bottom end. the application of a load p results in the compound rod storing a total of 5 j of energy. calculate (a) the gradually applied load; (b) the suddenly applied load; (c) the impact load that falls 100 mm and induces 5 j of energy; (d) the instantaneous stresses in both materials; and (e) the instantaneous elongation of the compound rod (egt = 200 gpa and egr = 100 gpa).
Answers: 2
You know the right answer?
A commercial refrigerator with refrigerant-134a as the working fluid is used to keep the refrigerate...