subject
Engineering, 18.07.2020 01:01 shae5231

Plzzz Hurrry Explain why Chloe’s design needs to be redone in the following scenario, and recommend the techniques she needs to include in her sketches. Chloe has drawn a design of a new supermarket. She has added all of her detail to one isometric sketch. The design was not done to scale, and the construction team is not sure how large the building will be once it is complete.

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, 19deleonl
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
image
Engineering, 04.07.2019 18:20, alexis9263
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
image
Engineering, 04.07.2019 18:20, kodyclancy
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
You know the right answer?
Plzzz Hurrry Explain why Chloe’s design needs to be redone in the following scenario, and recommend...

Questions in other subjects:

Konu
English, 18.10.2019 20:00