subject
Engineering, 23.06.2020 21:01 lewisf2578

A heavy construction firm has been awarded a contract to build a large concrete dam. It is expected that a total of 8 years will be required to complete the work. The firm will buy $600,000 worth of special equipment for the job. During the preparation of the job cost estimate, the following utilization schedule was computed for the special equipment: Year Utilization (hr/yr)
1 6000
2 4000
3 4000
4 1600
5 800
6 800
7 2200
8 2200
At the end of the job, it is estimated that the equipment can be sold at auction for $60,000.
(a) Compute the sum-of-years-digits' depreciation schedule.
(b) Compute the unit-of-production depreciation schedule

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 23:20, abbz13
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
image
Engineering, 04.07.2019 18:20, myahlit84
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
image
Engineering, 04.07.2019 18:20, rjone8429
Asimple rankine cycle uses water as the working fluid. the water enters the turbine at 10 mpa and 480c while the condenser operates at 6 kpa. if the turbine has an isentropic efficiency of 80 percent while the pump has an isentropic efficiency of 70 percent determine the thermal efficiency
Answers: 1
image
Engineering, 04.07.2019 18:20, cdyshaylia55
Water vapor initially at 10 bar and 400 °c is contained within a piston-cylinder assembly. the water lost heat to the surrounding according to isochoric (iso-volumetric) process until its temperature is 150 °c. the water is then condensed isothermally to saturated liquid. for the water as a system, calculate the work in kj/kg
Answers: 2
You know the right answer?
A heavy construction firm has been awarded a contract to build a large concrete dam. It is expected...

Questions in other subjects:

Konu
Mathematics, 17.05.2021 18:50