Engineering, 19.06.2020 09:57 geg05

During one eight-hour shift, 750 non-defective parts are desired from a fabrication operation. The standard time for the operation is 15 minutes. Because the machine operators are unskilled, the actual time it takes to perform the operation is 20 minutes, and ,on average, one-fifth of the parts that begin fabrication are scrapped. Assuming that each of the machines used for this operation will not be available for one hour of each shift, determine the number of machines required.

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, keigleyhannah30
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
image
Engineering, 04.07.2019 18:10, qwertylol12345
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
image
Engineering, 04.07.2019 18:10, Tyrant4life
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
image
Engineering, 04.07.2019 18:10, ayoismeisjjjjuan
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
You know the right answer?
During one eight-hour shift, 750 non-defective parts are desired from a fabrication operation. The s...

Questions in other subjects: