subject
Engineering, 13.05.2020 18:57 Min1on7

Currently, the lost time of each stage is 4 seconds, and intersection critical v/c ratio is set to be 0.75 to avoid cycle failures caused by randomness of arrival traffic. Solve the following problems: 1) identify critical lane groups and solve their sum of flow ratios; 2) minimum cycle length and optimal cycle length; 3) Autonomous vehicle technologies make traffic movement at intersections more efficient. The lost time of each stage is reduced to 2 seconds, saturation headway is reduced by 10%. If the intersection demand does not change, calculate the critical v/c ratio corresponding to the minimum cycle length in 2).

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, siri5645
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
image
Engineering, 04.07.2019 18:10, juansoto227711
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
image
Engineering, 04.07.2019 18:20, myahlit84
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
image
Engineering, 04.07.2019 18:20, DroctorWellsfan
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
You know the right answer?
Currently, the lost time of each stage is 4 seconds, and intersection critical v/c ratio is set to b...

Questions in other subjects:

Konu
Mathematics, 18.06.2020 20:57