A project requires transporting 13,000 cy of sand using (12) - cy dump trucks. A front-end loaded will load trucks at a rate pf 95 cy / hr. The trucks will transport the sand (7) miles at an average haul speed of 30 mi / hr, return speed of 40 mi / hr, and dump time of (3) minutes. Assume a (45) min effective hour for all equipment. (a) Calculate the number of trucks required to balance the production rate of the loader and (b) estimate the time to transport the sand based on the calculated number of trucks.

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 16:10, Arealbot
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
image
Engineering, 04.07.2019 18:10, yasminothman02
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
image
Engineering, 04.07.2019 18:10, aaliyah80
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
image
Engineering, 04.07.2019 18:10, katelynn73
Atmospheric air has a temperature (dry bulb) of 80° f and a wet bulb temperature of 60° f when the barometric pressure is 14.696 psia. determine the specific humidity, grains/lb dry air. a. 11.4 c. 55.8 d. 22.5 b. 44.1
Answers: 1
You know the right answer?
A project requires transporting 13,000 cy of sand using (12) - cy dump trucks. A front-end loaded wi...

Questions in other subjects:

Konu
Mathematics, 04.09.2019 05:30