subject
Engineering, 05.05.2020 18:35 journeyburks07

Two metal plates are connected by a long ASTM A479 904L stainless steel bar. A hot gas, at 400°C, flows between the plates and across the bar. The bar has a square cross section with a width of 2 cm, and the length of the bar exposed to the hot gas is 10 cm. The average convection heat transfer coefficient for the bar in crossflow is correlated with the gas velocity as h = 13.6V0.675, where h and V have the units W/m2⋅K and m/s, respectively. The maximum use temperature for the ASTM A479 904L is 260°C. The temperature of the bar is maintained by a cooling mechanism with the capability of removing heat at a rate of 100 W. Determine the maximum velocity that the gas can achieve without heating the stainless steel bar above the maximum use temperature set by the ASME Code for Process Piping.

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, koolgurl2003
Apump is used to circulate hot water in a home heating system. water enters the well-insulated pump operating at steady state at a rate of 0.42 gal/min. the inlet pressure and temperature are 14.7 lbf/in.2, and 180°f, respectively; at the exit the pressure is 60 lbf/in.2 the pump requires 1/15 hp of power input. water can be modeled as an incompressible substance with constant density of 60.58 lb/ft3 and constant specific heat of 1 btu/lb or. neglecting kinetic and potential energy effects, determine the temperature change, in °r, as the water flows through the pump.
Answers: 1
image
Engineering, 04.07.2019 18:10, samanthabutryn
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
image
Engineering, 04.07.2019 18:20, mjcbs21
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
You know the right answer?
Two metal plates are connected by a long ASTM A479 904L stainless steel bar. A hot gas, at 400°C, fl...

Questions in other subjects: