subject
Engineering, 05.05.2020 16:20 fespinoza019

5.12 A toll booth on a turnpike is open from 8:00 A. M. to 12 midnight. Vehicles start arriving at 7:45 A. M. at a uniform deterministic rate of six per minute until 8:15 A. M. and from then on at two per minute. If vehicles are processed at a uniform deterministic rate of six per minute, determine when the queue will dissipate, the total delay, the maximum queue length (in vehicles), the longest vehicle delay under FIFO, and the longest vehicle delay under LIFO.

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, niyawilliams23
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
image
Engineering, 04.07.2019 18:10, oliviasoreo92
Compute the pressure drop of 30°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
image
Engineering, 04.07.2019 18:10, jojoangelique13
The flow rate of air through a through a pipe is 0.02 m5/s. a pitot static tube is placed in the flow. the radius of the pitot static tube is 1 mm. assuming the flow to be steady and the air to be at 300k, calculate the difference in total and static pressure if the diameter of the pipe is: (a) d 0.1 m d 0.05 m (c) d 0.01 m
Answers: 2
image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
5.12 A toll booth on a turnpike is open from 8:00 A. M. to 12 midnight. Vehicles start arriving at 7...

Questions in other subjects:

Konu
Mathematics, 03.04.2020 03:13