A masonry facade consisting of 3,800 square feet is to be constructed for a building. The total cost per worker hour is estimated to be $31.50, and the total estimated cost of the labor for this task is $10,500. Assuming 8-hour work days and a crew of six workers, how many days should be allowed to complete this task? What is the production rate that the crew must attain to keep the project on schedule and within the budget?

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, aaliyah80
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
image
Engineering, 04.07.2019 18:10, wyattlb97
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
image
Engineering, 04.07.2019 18:20, mjcbs21
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
image
Engineering, 04.07.2019 18:20, kendrawalraven
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?