The aluminum column has a rectangular cross section and supports an axial load P. The base of the column is fixed. The support at the top allows rotation of the column in the x-y plane (i. e., bending about the strong axis) but prevents rotation in the x-z plane (i. e., bending about the weak axis).

(a) Determine the critical buckling load of the column for the following parameters: L = 54 in., b = 0.4 in., h = 0.8 in., and E = 10100 ksi.
(b) Determine the ratio b/h for which the critical buckling load about both the strong and weak axes is the same.

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, QueenLife4869
Awall of 0.5m thickness is to be constructed from a material which has average thermal conductivity of 1.4 w/mk. the wall is to be insulated with a material having an average thermal conductivity of 0.35 w/mk so that heat loss per square meter shall not exceed 1450 w. assume inner wall surface temperature of 1200°c and outer surface temperature of the insulation to be 15°c. calculate the thickness of insulation required.
Answers: 3
image
Engineering, 04.07.2019 18:20, hayleymckee
Steam enters a converging nozzle at 3.0 mpa and 500°c with a at 1.8 mpa. for a nozzle exit area of 32 cm2, determine the exit velocity, mass flow rate, and exit mach number if the nozzle: negligible velocity, and it exits (a) is isentropic (b) has an efficiency of 94 percent
Answers: 2
image
Engineering, 04.07.2019 18:20, 3076850
Prove the equivalence between the two statements of the 2nd law of thermodynamics (i. e., a violation of one statement leads to the violatio the other statement)
Answers: 2
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
The aluminum column has a rectangular cross section and supports an axial load P. The base of the co...

Questions in other subjects:

Konu
Physics, 19.03.2021 01:00
Konu
Arts, 19.03.2021 01:00
Konu
Mathematics, 19.03.2021 01:00