Engineering, 23.04.2020 23:49 ahrozycki

The federal new source performance standards for a new coal‐fired power plants require that emission of nitrogen oxides be less than 0.7lb of nitrogen oxides per million BTU of coal burned. If a plant emits 0.45lb of NO and 0.15 lb of NO2 per million BTU, what is its nitrogen oxide emission reported as?

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, yasyyas646646
Agas mixture consists of 8 kmol of h2 and 2 kmol of n2. determine the mass of each gas and the apparent gas constant of the mixture.
Answers: 3
image
Engineering, 04.07.2019 19:10, Lexi5170
A)-explain briefly the importance of standards in engineering design. b)- what is patent? c)-explain the relationship between these standards: b. s. and b. s.en d)- in engineering design concepts, types of loads and how they act are important factors. explain.
Answers: 3
image
Engineering, 04.07.2019 19:20, amandaaarmentaa
Acircular pipe of 30mm outside diameter is placed in an airstream at 30 c and latm pressure. the air moves in cross flow over the pipe at 20 m/s, while the outer surface of the pipe is maintained at 110 c. what is the drag force exerted on the pipe per unit length? what is the rate of heat transfer from the pipe per unit length?
Answers: 1
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
The federal new source performance standards for a new coal‐fired power plants require that emission...

Questions in other subjects:

Konu
History, 31.03.2020 19:28
Konu
Mathematics, 31.03.2020 19:28