subject
Engineering, 21.04.2020 15:29 Totototono

A 2-lane highway is to be constructed across a 6-ft diameter metal culvert which is oriented perpendicular to the highway center line. The culvert is located at station 33+00, and the invert (bottom) of the culvert has an elevation of 150 ft. The elevation of station 21+00 on the tangent alignment is 140 ft. The alignment gradient is +4.0% from station 21+00 to station 29+00, and the gradient from station 29+00 to 37+00 is -3%.

a. Find the longest full station vertical curve that will give approximately 3 ft (3 plusminus 0.5 ft) of cover over the top of the culvert.
b. Compute the station and elevation of the PVC and PVT and the elevation of each full station on the vertical curve.

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, mm016281
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit. explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
image
Engineering, 04.07.2019 18:10, abdirahmansoloman
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
image
Engineering, 04.07.2019 18:10, niyawilliams23
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
image
Engineering, 04.07.2019 18:10, aaliyah80
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
You know the right answer?
A 2-lane highway is to be constructed across a 6-ft diameter metal culvert which is oriented perpend...

Questions in other subjects:

Konu
Mathematics, 26.04.2021 09:30
Konu
Chemistry, 26.04.2021 09:30