Engineering, 21.04.2020 01:38 emmaguentherp3hjd3

Scheduling. Three batch jobs, A through E, arrive at a computer center at almost the same time. They have estimated running times of 10, 6, 2, 4 and 8 minutes. Their priorities are 3, 5, 2, 1 and 4 respectively, with 5 being the highest priority. For each of the following scheduling algorithms, determine the mean turnaround time. Ignore any process switching overhead.

a) Round Robin
b) Priority Scheduling
c) First Come, first served (run in order A, B, C, D, E)
d) Shortest job first

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 16:10, Arealbot
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
image
Engineering, 04.07.2019 18:20, RiverH246
Air flows over a heated plate àt a velocity of 50m/s. the local skin factor coefficient at a point on a plate is 0.004. estimate the local heat transfer coefficient at this point. the following property data for air are given: density = 0.88kg/m3 , viscosity 2.286 x 10 ^-5 kgm/s , k = 0.035w/mk ,cp = 1.001kj/kgk. use colburn reynolds analogy.
Answers: 1
image
Engineering, 04.07.2019 18:20, annette211pdd8v9
For a gate width of 2 m into the paper, determine the force required to hold the gate abc at its location.
Answers: 1
image
Engineering, 04.07.2019 19:10, LadyHolmes67
Apressure vessel with an r/t 20 cannot be treated as thin walled vessel. a)-trune b)- false
Answers: 3
You know the right answer?
Scheduling. Three batch jobs, A through E, arrive at a computer center at almost the same time. They...

Questions in other subjects:

Konu
Mathematics, 15.11.2020 19:30
Konu
Mathematics, 15.11.2020 19:30