Consider a drainage basin having 60% soil group A and 40% soil group B. Five years ago the land use pattern in the basin was ½ wooded area with poor cover and ½ cultivated land (row crops/contoured and terraces) with good conservation treatment. Now the land use has been changed to 1/3 wooded area with poor cover, 1/3 cultivated land (row crops/contoured and terraces) with good conservation treatment, and 1/3 commercial and business area.

(a) Estimate the increased runoff volume during the dormant season due to the land use change over the past 5-year period for a storm of 35 cm total depth under the dry antecedent moisture condition (AMC I). This storm depth corresponds to a duration of 6-hr and 100-year return period. The total 5-day antecedent rainfall amount is 30 mm. (Note: 1 in = 25.4 mm.)
(b) Under the present watershed land use pattern, find the effective rainfall hyetograph (in cm/hr) for the following storm event using SCS method under the dry antecedent moisture condition (AMC I).

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, ashleybaber4966
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
image
Engineering, 04.07.2019 19:10, gabigalvis1091
What is the main objective of using reheat rankine cycle?
Answers: 3
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
image
Engineering, 06.07.2019 02:30, heavenwagner
A12 mm diameter shaft runs in a plain cylindrical bush 30 mm long that is located in an 18 mm diameter hole in a housing. the shaft-inner bush fit is h8 f and the outer bush-housing fit is h7-p6. make a fully cimensioned sketch of the bush with tolerances. find the maximum and minimum clearance or interference for both fits on the inner and outer diameters of the bush
Answers: 3
You know the right answer?
Consider a drainage basin having 60% soil group A and 40% soil group B. Five years ago the land use...

Questions in other subjects:

Konu
Spanish, 10.11.2020 23:30
Konu
Mathematics, 10.11.2020 23:30