subject
Engineering, 17.04.2020 02:18 RegencySlayer5304

You must supply a 100 MW load. You can buy a five year contract for 100 MW of power 24 hours a day for $130M. (You pay the $130M up front and can consume up to 100 MW per hour. Any power you do not use is lost. But, assume you will use all of it.) Alternatively, you can buy a 100 MW generator with a 30 year life for $70M and pay fuel and maintenance costs of $15/MWh. Analyze costs using a 4% real interest rate and determine which is the cheaper alternative.

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, brooklyn674
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
image
Engineering, 04.07.2019 18:10, skpdancer1605
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
image
Engineering, 04.07.2019 18:10, lerasteidl
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
image
Engineering, 04.07.2019 18:10, leomessifanboy678
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
You know the right answer?
You must supply a 100 MW load. You can buy a five year contract for 100 MW of power 24 hours a day f...

Questions in other subjects:

Konu
Arts, 01.01.2022 02:30
Konu
Computers and Technology, 01.01.2022 02:30