subject
Engineering, 16.04.2020 04:56 chutchinson256

Logical variables: Running late? Complete the tunction RunningLate such that the logical variable on Time is true if no Traffic is true and gasEmpty is false. Ex >> n°Traffic = true ; >> gasEmpty-false; >onTime - Runninglate(noTraffic, gasEmpty) logical Your Function B Save C Reset EE MATLAB Documentation 1 function onTime - RunningLate (noTraffic, gasEmpty) 2 % complete the logical expression to the right of . using the variables n°Traffic and gasEmpty 4 onTime - 6 end Code to call your function C Reset 1 noTraffic true; gasEmpty true; 2 onTime-Runninglate(noTraffic, gasEmpty)

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, qwertylol12345
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
image
Engineering, 04.07.2019 18:10, Talos02
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
image
Engineering, 04.07.2019 18:10, Strick1530
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
image
Engineering, 04.07.2019 18:10, nandalabella06
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
You know the right answer?
Logical variables: Running late? Complete the tunction RunningLate such that the logical variable on...

Questions in other subjects: