In the Dorben Company a materials handling operation in the warehouse is being done by hand labor. Annual disbursements for this labor and for closely related expenses (social security, accident insurance, and other fringe benefits), are $8,200. The methods analyst is considering a proposal to build certain equipment to reduce this labor cost. The first cost of this equipment will be $15,000. It is estimated that the equipment will reduce annual disbursements for labor and labor extras to $3,300. Annual payments for power, maintenance, and property taxes and insurance are estimated to be $400, $1,100, and $300, respectively. The need for this particular operation is anticipated to continue for 10 years. Because the equipment is specially designed for the particular purpose, it will have no salvage value. It is assumed that the annual disbursements for labor, power, and maintenance will be uniform throughout the 10 years. The minimum rate of return before income taxes is 10 percent. Based on annual cost comparison, should the company proceed with the new material handling equipment?

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, qwertylol12345
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
image
Engineering, 04.07.2019 18:20, alexis9263
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
image
Engineering, 06.07.2019 03:10, tatedason33741
Asolid steel sphere (k=63.9 w m-1 k-1 , ? =7832 kg m-3 , c=0.523 kj kg-1 k-1 ), 100 mm in diameter is initially at a uniform temperature of 500o c and is suddenly quenched in a large oil bath for which t? = 100o c and h = 3200 w m-2 k-1. estimate the time required for the sphere to cool to 200o c and to 110o c