A co-flowing heat exchanger receives air at 800K and 15 MPa and water at 15oC and 100 kPa. The two flows exchange energy as they flow alongside each other to the exit, where the air should be cooled to 350K. Investigate the range of water flows necessary per kilogram per second of air flow and the possible water exit temperatures, with the restriction that the minimum temperature difference between the water and air should be 25oC. Include an estimation for the overall entropy generation in the process per kilogram of air flow. Support your analysis with graphical plots whenever possible to make your analysis easy to follow and understand. Assume that the heat exchanger loses heat to the environment which is at 4oC and estimate the range of that heat loss per kg/s of air flow in order not to violate the Second Law of Thermodynamics (i. e. in order not to get a negative entropy generation amount).

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, ayoismeisjjjjuan
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
image
Engineering, 04.07.2019 18:20, 3076850
Prove the equivalence between the two statements of the 2nd law of thermodynamics (i. e., a violation of one statement leads to the violatio the other statement)
Answers: 2
image
Engineering, 04.07.2019 18:20, Doogsterr
For each of the following process: a) sketch the p-v diagram, b)sketch t-s diagram, c) sketch t-v diagram, d) sketch the boundary work on one of the diagrams (a, b or c) and e) sketch the reversible heat transfer on one of the diagrams (a, b or c): 1- isobaric process from compressed liquid to superheated vapor 2- isothermal process from compressed liquid to superheated vapor 3- isentropic process from compressed liquid to superheated vapor
Answers: 3
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
A co-flowing heat exchanger receives air at 800K and 15 MPa and water at 15oC and 100 kPa. The two f...