subject
Engineering, 14.04.2020 21:43 jolleyrancher78

Design a PD controller to decrease the peak time by 1 2 from the peak time of the uncompensated system from question 1e while keeping the %OS the same. Find the following values to 5 significant digits. Ensure there are no rounding errors by storing variables. I. The new desired dominant pole location of the closed-loop system to achieve this time r

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, qwertylol12345
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
image
Engineering, 04.07.2019 18:10, ijohnh14
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
image
Engineering, 04.07.2019 18:10, Tyrant4life
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
image
Engineering, 04.07.2019 18:10, dval1146
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
You know the right answer?
Design a PD controller to decrease the peak time by 1 2 from the peak time of the uncompensated syst...

Questions in other subjects:

Konu
Mathematics, 14.11.2020 01:50