Engineering, 08.04.2020 23:23 guzmangisselle
An AC load draws 5 kW of power at a lagging PF of 0.8 from a 60 Hz power line. If the effective voltage drawn by the load is 120 Vrms, calculate the value of capacitor needed to correct the given load to a PF of 1. Express your answer in micro-Farads (µF). 1 micro = 10-6
Answers: 3
Engineering, 06.07.2019 02:30, onlymyworld27
In a unit cell of fcc structure, indicate the position of one of the tetrahedral interstitial sites by plotting the corresponding tetrahedron. do the same for one of the octahedral interstitial sites (in a separate fcc unit cell). mark the positions of all the tetrahedral and octahedral interstitial sites in the unit cells. how many equivalent tetrahedral sites and how many equivalent octahedral sites are contained in a fcc unit cell, respectively. what is the coordination number for a tetrahedral site and what is the coordination number for an octahedral site?
Answers: 2
Engineering, 06.07.2019 03:30, relic7391
The load on a bolt consists of an axial pull of 10 kn together with a transverse shear force of 5 kn. the bolt material has a yield strength of syt syc 100 mpa. find the diameter of the bolt at factor of safety n-0.5, n 1 and n-2 using maximum shear stress theory
Answers: 3
An AC load draws 5 kW of power at a lagging PF of 0.8 from a 60 Hz power line. If the effective volt...
Mathematics, 12.06.2020 17:57
Mathematics, 12.06.2020 17:57