Construction of a reservoir behind a dam Group of answer choices
a. stabilizes the sides of r...
Engineering, 30.03.2020 21:26 ladybugys
Construction of a reservoir behind a dam Group of answer choices
a. stabilizes the sides of reservoir walls; the water buoys them up.
b. destabilizes the slopes because of the weight of the dam.
c. can destablize the slopes by increasing pore fluid pressure.
d. has no effect on slope stability.
Answers: 2
Engineering, 04.07.2019 18:10, sarahgrindstaff123
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
Engineering, 04.07.2019 18:10, nandalabella06
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
Engineering, 04.07.2019 19:10, gabigalvis1091
What is the main objective of using reheat rankine cycle?
Answers: 3