subject
Engineering, 30.03.2020 16:35 hilljade45

Vehicles arrive at a single toll booth beginning at 7:00 A. M. at a rate of 8 veh/min. Service also starts at 7:00 A. M. at a rate of μ(t) = 6 + 0.2t where μ(t) is in vehicles per minute and t is in minutes after 7:00 A. M. Assuming D/D/1 queuing, determine when the queue will clear, the total delay, and the maximum queue length in vehicles.

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 03:10, lauriepdx17
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
image
Engineering, 04.07.2019 18:10, ashleybaber4966
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
image
Engineering, 04.07.2019 18:10, DestyHilBan1183
Adouble-strand no. 60 roller chain is used to transmit power between a 13-tooth driving sprocket rotating at 300 rev/min and a 52-tooth driven sprocket. a) what is the allowable horsepower of this drive? b) estimate the center-to-center distance if the chain length is 82 pitches. c) estimate the torque and bending force on the driving shaft by the chain if the actual horsepower transmitted is 30 percent less than the corrected (allowable) power.
Answers: 3
image
Engineering, 04.07.2019 18:10, dval1146
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
You know the right answer?
Vehicles arrive at a single toll booth beginning at 7:00 A. M. at a rate of 8 veh/min. Service also...

Questions in other subjects:

Konu
Mathematics, 06.11.2019 08:31