subject
Engineering, 24.03.2020 21:28 jaylinzavala

A contractor needs to excavate 50,000 yd3 of silty clay and haul it with Caterpillar 69C dump trucks. Each truck can carry 30.9 yd3 of soil per load, and operates on a 15-minute cycle. The job must be completed in five working days with the trucks working two 8-hour shifts per day. Using a bulking factor of 30%, how many trucks will be required

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, kayabwaller4589
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
image
Engineering, 04.07.2019 18:10, anna22684
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
image
Engineering, 04.07.2019 18:10, sarahgrindstaff123
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
image
Engineering, 04.07.2019 18:10, xboxdude06
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
You know the right answer?
A contractor needs to excavate 50,000 yd3 of silty clay and haul it with Caterpillar 69C dump trucks...

Questions in other subjects:

Konu
Social Studies, 31.03.2020 17:06