The construction time for a bridge is weather dependent. The project is expected to take 150 days if the weather is dry and hot. If the weather is damp and cool, it is expected to take 350 days. Otherwise, it is expected to take 300 days. Historical data suggests that there is a 40% chance of cool damp weather and a 10% chance of hot dry weather. What is the expected completion time of the project? g
Answers: 3
Engineering, 03.07.2019 14:10, cowgyrlup124
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
Engineering, 04.07.2019 18:10, lowkeyqueenk
Apipe with an outside diameter of 15 cm is exposed to an ambient air and surrounding temperature of -20°c. the pipe has an outer surface temperature of 65°c and an emissivity of 0.85. if the rate of heat loss from the pipe surface is 0.95 kw per meter of length, the external convective heat transfer coefficient (h) is: (a) 12.5 w/m"k (b) 18.6 w/mk (c) 23.7 w/mk (d) 27.9 w/mk (e) 33.5 w/mk
Answers: 1
Engineering, 04.07.2019 18:10, leomessifanboy678
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
The construction time for a bridge is weather dependent. The project is expected to take 150 days if...
Physics, 20.07.2019 23:30
Social Studies, 20.07.2019 23:30