subject
Engineering, 17.03.2020 20:36 moonk7733

Cuts-R-Us provides low cost haircuts at a shopping center in Boise, Idaho. During the day, customers arrive at an average rate of nine per hour following a Poisson distribution. After a customer is in a cosmetician s chair, it takes an average of 18 minutes for the haircut to be completed, with the actual service time following a Poisson distribution. a. If there are three cosmeticians on duty, how long will customers have to wait on average before receiving service, and how many customers are typically waiting for service? b. If there are four cosmeticians on duty, how long will customers have to wait on average before receiving service, and how many customers are typically waiting for service? c. If there are five cosmeticians on duty, how long will customers have to wait on average before receiving service, and how many customers are typically waiting for service? d. If you managed this store, how many cosmeticians would you employ and why?

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, cowgyrlup124
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
image
Engineering, 04.07.2019 18:10, winterblanco
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
image
Engineering, 04.07.2019 19:10, babas97
What is a monomer? how do they form a ploymer from the view point of chemical bonding?
Answers: 1
image
Engineering, 04.07.2019 19:10, rhiannpelham60
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
You know the right answer?
Cuts-R-Us provides low cost haircuts at a shopping center in Boise, Idaho. During the day, customers...

Questions in other subjects: