subject
Engineering, 16.03.2020 17:32 Mtross30

A four-lane northbound section of interstate has rigid pavement and was designed with an 8-inch slab, 90% reliability, a 700 lb/in2 concrete modulus of rupture, a 5 million lb/in2 modulus of elasticity, a 3.0 load transfer coefficient, and an overall standard deviation of 0.3. The initial PSI is 4.6 and the TSI is 2.5. The pavement was conservatively designed (assuming the upper limit of the W18 design lane load) to last 20 years, and the CBR is 25 with a drainage coefficient of 1.0. A design mistake was made that ignored 1000 total northbound (daily) passes of trucks with 22-kip single and 30-kip tandem axles. What slab thickness should have been used?

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, cowgyrlup124
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
image
Engineering, 04.07.2019 18:10, samanthabutryn
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
image
Engineering, 04.07.2019 19:10, nida7864
An engine, weighing 3000 n, is supported on a pedestal mount. it has been observed that the engine induces vibration into the surrounding area through its pedestal at the maximum operating speed. determine the stiffness of the dynamic vibration absorber spring in (n/m) that will reduce the vibration when mounted on the pedestal. the magnitude of the exciting force is 250 n, and the amplitude of motion of the auxiliary mass is to be limited to 2 mm note: in this question type-in right numbers, no decimals, no fractions, no unit. approximate to right number if needed
Answers: 3
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
A four-lane northbound section of interstate has rigid pavement and was designed with an 8-inch slab...

Questions in other subjects:

Konu
Mathematics, 18.09.2020 14:01
Konu
Mathematics, 18.09.2020 14:01
Konu
Spanish, 18.09.2020 14:01
Konu
Spanish, 18.09.2020 14:01
Konu
Mathematics, 18.09.2020 14:01
Konu
Mathematics, 18.09.2020 14:01
Konu
Mathematics, 18.09.2020 14:01
Konu
Mathematics, 18.09.2020 14:01
Konu
History, 18.09.2020 14:01
Konu
History, 18.09.2020 14:01